Firewater Tank Floor Reinforcement

In this project, ICR was tasked with the rapid reinstatement of a fire water tank floor was required to address internal corrosion protection and localised structural damage. All applicable API, ISO, and ASME code requirements were met for both structural repair and coating application.

The repair covered all obstructions on the tank floor and extended into the lower wall section. The inspection regime for Technowrap™ follows the same requirements as those for the original steel tank.

Read the full case study to see the solution delivered.